PROJECT: SPORTS COMPLEX IN GORLIZ
CONTRIBUTORS: JON MONTERO MADARIAGA E INMANOL MONTERO VIAR ARCHITECTS / EPTISA ENGINEERING
LOCATION: Gorliz, Bizkaia. País Vasco.
DATE: 2011
SPONSOR: GORLIZ CITY COUNCIL
BUILDER: ______
BUDGET: ______
BUILT SURFACE: 9.689,90 m2
The proposed location for the new sports facilities in the municipality of Gorliz is part of the current sports area Uresarantze completing the soccer fields, tennis and athletics which exist nowadays. The parcel is part of a landscape dominated by a strong topography which eventually forms a depression starring stepped platforms in order to accommodate sporting uses. A woodland consisting mainly of pines and oaks is the landscape where are this sports complex. The location of the proposed building reflects the desire to keep as a reference, the longitudinal axis that exists in the sports hall, now embodied by a walking tour of the football field and stairs by saving different platforms in North direction.
The access of the building and its center of gravity is located in this north-south axis, and from this center it is distributed in a fan shape. This movement to divide the building into three main volumes, the central axis would correspond to the campus and would place the main entrances and vertical communications, a second volume located on the east is where would be located mainly swimming pools, spas, locker rooms, fitness area and outdoor solarium, and a third volume located on the west is where the front wall would stand, changing rooms and the paddle. The building has two entrances, the first one, located across the street Uresarantze, new pedestrian access would be construct, due to the proximity of existing public parking on the road and the proximity of a stop public transport.
This access would be an alternative to currently existing access in the lower and middle area of the complex, taking the opportunity to enter from the upper platform through a path in which the wavy geometry of the roof allows us to frame the landscape. The second, located on the level of the artificial football field and is produced by the movement on the ground in a "fan-shaped" allows to harbor the interior pedestrian paths and the necessary access for service vehicles.
This building is designed to be built in two phases, a first in which we could build the access volume, vertical communications and administration, and the volume located on the east that would house the pool, spa areas, locker rooms and gym; a second phase in which it would build the building located on the west and would house the pelota court with their changing rooms, and two paddle courts. Outside, two tennis courts would be relocated, initially uncovered, but with the skill to do it so easily in the future, due to the topography where is located the project.